![]() | Sun System Handbook - ISO 4.1 October 2012 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||
Solution Type Technical Instruction Sure Solution 1490118.1 : How to Remove and Replace Netra 210 Power Supply:ATR:1490118.1:0
In this Document
Applies to:Sun Netra 210 Server - Version All Versions to All Versions [Release All Releases]Information in this document applies to any platform. GoalNetra 210 - How to Remove and Replace Netra 240 Power Supply FixDISPATCH INSTRUCTIONS WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: Netra 210 product training is desirable but not required, as the part is a CRU
TASK COMPLEXITY: 0 FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS: PROBLEM OVERVIEW: Fault Power Supply WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?: For a single power supply configuration, the customer should take normal precautions to backup data, notify users of the maintenance and that the system will be powered down. The customer should conduct an orderly software system shutdown. WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?: Removing the Power Supply 1. Power off the server, remove the server from the rack, and remove the top cover and airduct. 3. Remove fan 4 and 5. 5. Disconnect the power supply cables from the connectors in this order: 6. Loosen the power supply thumbscrew at the chassis rear panel. 7. Slide the power supply forward, and lift it out of the chassis. 8. Set the power supply aside on an antistatic mat. 9. Replace the Power Supply
Installing the Power Supply 1. Locate where the power supply installs. The power supply installs at the right rear of the chassis. 2. Remove the replacement power supply from its shipping container and antistatic packaging. 3. Lower the power supply into the chassis, ensuring that it locks with the mounting tabs. 4. Tighten the power supply thumbscrew at the chassis rear panel. 5. Connect the power supply cables to the connectors in this order: 6. Press the SAS cables into the clamps on the side of the power supply. Note – Press down on the power supply cables to aid when later installing the air duct. 7. Install fan 4 and 5. 8. Install the air duct and top cover, install the server into the rack, power on the server, and verify the installation
OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO If the replacement was a hot swap/plug on a redundant configuration, the system should be operational and need no further work. PARTS NOTE: https://support.oracle.com/handbook_private/Systems/Netra_210/components.html REFERENCE INFORMATION: Please refer to the Netra 210 Server Service Manual: http://docs.oracle.com/cd/E19102-01/n210.srvr/819-2750-10/819-2750-10.pdf Attachments This solution has no attachment |
||||||||||||||
|