Sun Microsystems, Inc.  Sun System Handbook - ISO 4.1 October 2012 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1479516.1
Update Date:2012-09-03
Keywords:

Solution Type  Technical Instruction Sure

Solution  1479516.1 :   How to Remove and Replace Netra 240 Battery:ATR:1479516.1:1  


Related Items
  • Sun Netra 240 (DC) Server
  •  
  • Sun Netra 240 (AC) Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Fix


Applies to:

Sun Netra 240 (DC) Server - Version All Versions to All Versions [Release All Releases]
Sun Netra 240 (AC) Server - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Goal

  How to Remove and Replace Netra 240 Battery

Fix

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
Netra 240 product training is desirable but not required, as the part is a CRU

TASK COMPLEXITY: 1

TIME ESTIMATE: 50 minutes

FIELD ENGINEER INSTRUCTIONS

PROBLEM OVERVIEW: Battery failure

OBTAIN CUSTOMER ACCEPTANCE

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

A data backup is not a pre-requisite but is a wise precaution.
The customer should conduct an orderly software system shutdown.

WHAT ACTION DOES THE FIELD ENGINEER/CUSTOMER ADMINISTRATOR NEED TO TAKE:

Removing and Installing the Battery

1.Power off the server.

2.Remove the server cover.

3.Open the rotating service module.

4.Ensure that the server is properly grounded.

5. Unclip and remove the battery located on the top right (BR2032) from the system board. See the Oracle System Handbook system board:

https://support.oracle.com/handbook_private/Devices/System_Board/SYSBD_Netra240_CPU.html


6. Insert new battery

7. Close back of system cover.

8. Power up system.

9. Set Time Of Date .

 

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN the SYSTEM TO AN OPERATIONAL STATE:


Restart software applications per applicable administration guides to resume system operation.


PARTS NOTE: Include Battery Unit location:

https://support.oracle.com/handbook_private/Systems/Netra_240_R/components.html#Batteries

https://support.oracle.com/handbook_private/Systems/Netra_240/components.html#Batteries


ADDITIONAL COMMENTS:

Please refer to the Netra 240 Server Service Manual: http://docs.oracle.com/cd/E19102-01/n240.srvr/817-2699-13/817-2699-13.pdf

 

 


Attachments
This solution has no attachment
  Copyright © 2012 Sun Microsystems, Inc.  All rights reserved.
 Feedback