Goal
How to Replace a Netra T5220 PCI Riser or Mezzanine
**********************************************************************
To report errors or request improvements on this procedure,
please put a comment on Doc ID: 1464580.1
**********************************************************************
Fix
DISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
T5220 Product Training or field experience with other CMT servers.
TIME ESTIMATE: 60 minutes
Task Complexity: 1
FIELD ENGINEER INSTRUCTIONS
PROBLEM OVERVIEW: Faulty Disk Backplane
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
A data backup is not a pre-requisite but is a wise precaution.
Customer should shut the operating system down gracefully (using "init 0"), and after the system has shut down Switch from the system console to the -> prompt by typing the #. (Hash Period) key sequence. At the -> prompt, type the stop /SYS command.
WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
*** Follow standard ESD procedures to avoid Electrostatic Discharge
1. Disconnect all power cables & PCI card cables, but please note their locations for reassembly.
2. Remove the Top Cover
Removal:
1. Remove the power/i2c cable from the mezzanine
2. Loosen the green captive screws on the mezzanine & lift it out of the server.
3. (If needed) Loosen the captive screw securing the riser to the motherboard & lift the riser up to remove it from the system.
Installation:
1. (If needed) mount the PCI riser & then secure the captive screws.
2. Position the PCI Mezzanine over the risers, gently depress it onto the risers, & tighten the green captive screws.
3. Attach the power/i2c cable to the mezzanine.
4. Install Top Cover.
5. Connect all power & PCI cables.
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE FE/CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Boot system and monitor boot sequence for errors. Test functionality of system:
1. Run the Solaris "fmadm faulty" and SP/ILOM "show faulty" command (if only ALOM is supported run "showfaults -v" command) to verify that the fault has been cleared.
2. Perform one of the following tasks based on your verification results:
* If the previous steps did not clear the fault, refer to doc 1004229.1 for information about the tools and methods you can use to diagnose and clear component faults.
* If the previous steps indicate that no faults have been detected, then the component has been replaced successfully. No further action is required
3. Restart software applications per applicable administration guides to resume system operation.
PARTS NOTE: https://support.oracle.com/handbook_private/Systems/Netra_T5220/components.html#I/O
REFERENCE INFORMATION: http://docs.oracle.com/cd/E19350-01/index.html
Attachments