Sun Microsystems, Inc.  Sun System Handbook - ISO 4.1 October 2012 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1464101.1
Update Date:2012-08-30
Keywords:

Solution Type  Technical Instruction Sure

Solution  1464101.1 :   How to replace a Netra T5440 Memory Mezzanine Assembly:ATR:1464101.1:0  


Related Items
  • Sun Netra T5440 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




Applies to:

Sun Netra T5440 Server - Version Not Applicable and later
Information in this document applies to any platform.

Goal

How to replace a Netra T5440 Memory Mezzanine Assembly

*********************************************************************
To report errors or request improvements on this procedure,
please Add a Comment on Doc ID: 1464101.1
*********************************************************************

Fix

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
Netra T5440 product training or field experience with other CMT servers.

TIME ESTIMATE: 30 minutes

Task Complexity: 0

FIELD ENGINEER INSTRUCTIONS

PROBLEM OVERVIEW:  Defective memory mezzanine

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?
A data backup is not a pre-requisite but is a wise precaution. System needs to be shutdown by customer

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
Take ESD Precautions. Components inside the chassis might be hot. Use caution when servicing components inside the chassis.

Remove the Mezzanine:

1.  Remove the top cover,

2.  Remove the Memory Air Duct,

3.  Rotate the memory mezzanine green levers 90 degrees to vertical & lift the memory mezzanine tray straight up and out of the chassis.

4.  Remove the 2 Memory Riser cards.

 

Install the Mezzanine:

1.  Move the DIMMs from the original mazzanine to the replacement  & place into the same location.

2.  Install the 2 Memory Risers,

3.  Place the memory mezzanine tray in the chassis, & carefully set the memory mezzanine onto the riser cards.   Rotate the memory mezzanine green levers 90 degrees to horizontal.  These levers handle seating the memory mezzanine onto the riser cards. You do not need to press down on the tray.

4.  Install the Memory Air Duct.

5.  Install the top cover.

 

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE FE/CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:

Boot system and monitor boot sequence for errors. Test functionality of system:
1. Run the Solaris "fmadm faulty" and SP/ILOM "show faulty" command (if only ALOM is supported run "showfaults -v" command) to verify that the fault has been cleared.
2. Perform one of the following tasks based on your verification results:
   * If the previous steps did not clear the fault, refer to doc 1004229.1 for information about the tools and methods you can use to diagnose and clear component faults.
   * If the previous steps indicate that no faults have been detected, then the component has been replaced successfully. No further action is required
3. Restart software applications per applicable administration guides to resume system operation.

PARTS NOTES:   https://support.oracle.com/handbook_private/Systems/Netra_T5440/components.html#Memory


REFERENCE INFORMATION:  http://docs.oracle.com/cd/E19874-01/index.html


Attachments
This solution has no attachment
  Copyright © 2012 Sun Microsystems, Inc.  All rights reserved.
 Feedback