Sun Microsystems, Inc.  Sun System Handbook - ISO 4.1 October 2012 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1462773.1
Update Date:2012-09-04
Keywords:

Solution Type  Technical Instruction Sure

Solution  1462773.1 :   How to Remove and Replace a SPARC T6340 RAID Expansion Module:ATR:1462773.1:0  


Related Items
  • Sun Blade T6340 Server Module
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Fix


Applies to:

Sun Blade T6340 Server Module - Version Not Applicable and later
Information in this document applies to any platform.

Goal

How to Remove and Replace a SPARC T6340 RAID Expansion Module

********************************************************************************
To report errors or request improvements on this procedure,
please Add a Comment on Doc ID: 1462773.1
********************************************************************************

Fix

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
T6340 training is desirable but not required

TIME ESTIMATE: 30 minutes

TASK COMPLEXITY: 0

FIELD ENGINEER INSTRUCTIONS

PROBLEM OVERVIEW: failed RAID Expansion Module (REM)

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

Note: If T6340 is connected to a Disk Module, save the configuration before removing it.
Refer to the Sun Blade 6000 Disk Module Service Manual, http://docs.oracle.com/cd/E19045-01/blade.6000disk/820-1703-13/index.html
and the Sun Blade 6000 Disk Module Administration Guide http://docs.oracle.com/cd/E19045-01/blade.6000disk/820-4922-16/index.html

Shut Down the Oracle Solaris OS
Prepare the Server Module for Removal
Remove the Server Module From the Modular System
Remove the Cover
ESD Safety Measures

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

Remove a REM

1. Lift up on the REM ejector lever.
2. Lift the card free from the connector.
3. Lift the REM free from the plastic standoff.

Install a REM

1. Slide the end of the REM opposite the connector under the tabs of the plastic standoff.
2. Press on the rubber button on the top of the card until the connector engages with the connector on the motherboard.

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:

Boot system and monitor boot sequence for errors. Test functionality of system:
1. Run the Solaris "fmadm faulty" and SP/ILOM "show faulty" command (if only ALOM is supported run "showfaults -v" command) to verify that the fault has been cleared.
2. Perform one of the following tasks based on your verification results:
   * If the previous steps did not clear the fault, refer to doc 1004229.1 for information about the tools and methods you can use to diagnose and clear
     component faults.
   * If the previous steps indicate that no faults have been detected, the component has been replaced successfully. No further action is required
3. Restart software applications per applicable administration guides to resume system operation.


PARTS NOTE:

https://support.oracle.com/handbook_private/Systems/SunBladeT6340/SunBladeT6340.html

REFERENCE INFORMATION:

SPARC T6340 Server Module Service Manual at http://docs.oracle.com/cd/E19826-01/820-3902-12/index.html


Attachments
This solution has no attachment
  Copyright © 2012 Sun Microsystems, Inc.  All rights reserved.
 Feedback