Asset ID: |
1-71-1455394.1 |
Update Date: | 2012-07-20 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
1455394.1
:
How to Replace a Sun Blade X3-2B(X6270M3) and Netra Blade X3-2B(Netra X6270M3) System (CMOS) Battery:ATR:1455394.1:0
Related Items |
- Netra Blade X3-2B
- Sun Blade X3-2B
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: x64-CAP VCAP
|
In this Document
Applies to:
Netra Blade X3-2B - Version Not Applicable and later
Sun Blade X3-2B - Version Not Applicable and later
Information in this document applies to any platform.
Goal
How to remove and replace a System (CMOS) Battery in a Sun Blade X6270M3 Server Module or Netra X6270M3 Server Module.
Fix
DISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
No specific skills required
TASK COMPLEXITY: 0
DELIVERY REQUIREMENT:
Maintenance window may be required
TIME ESTIMATE: 15 minutes
FIELD ENGINEER INSTRUCTIONS
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
Caution – Removing the system battery will clear the CMOS and return the BIOS settings to their factory defaults. The BIOS will automatically notify you of this change the next time you boot the system.
WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
Prepare the server for service.
a. Power off the server module.
b. Remove the server module from the chassis and lay it flat cover side up on an anti-static mat.
Caution - After removing the server from the chassis insert a filler panel into an empty slot to reduce the possibility of a system shutdown.
c. Attach an antistatic wrist strap.
d. Remove the top cover.
To remove and install the system battery,
a. Using your fingers, unlatch the battery from the socket by gently pushing the top edge of the battery away from the
battery holder.
b. Lift the battery up and out of the socket.
c. Locate the replacement system battery then insert the battery into the socket with the positive (+) side of the battery facing toward the server module side wall.
Install the cover on the server.
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Boot up system and verify full functionality
PARTS NOTE:
REFERENCE INFORMATION:
Sun Blade X6270 M3 Server Module Service Manual
http://docs.oracle.com/cd/E20881_01/index.html
Sun Netra X6270 M3 Server Module Service Manual
http://docs.oracle.com/cd/E26403_01/index.html
Attachments
This solution has no attachment