![]() | Sun System Handbook - ISO 4.1 October 2012 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||
Solution Type Technical Instruction Sure Solution 1348035.1 : How to Remove and Replace X2200 M2 Cable Kit:ATR:1348035.1:0
In this Document
Applies to:Sun Fire X2200 M2 Server - Version: Not Applicable to Not Applicable - Release: N/A to N/AInformation in this document applies to any platform. GoalReplace X2200 Cable KitSolutionCAP PROBLEM OVERVIEW: How to Remove and Replace Cable KitWHAT SKILLS DOES THE ENGINEER NEED? ESD Awareness and basic hardware competence Task Complexity: 0 Time Estimate: 30 minutes WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? Power off the server and remove the top cover. Lay out the replacement cable kit next to the installed cable kit to ensure the routing of the new cable kit matches that of the old cable kit. Ensure that all connectors on the new kit match the connector name and location of the old cable kit. Remove the old cable kit. Install the new cable kit. Replace the top cover. WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE? Power on the system ANY PARTS NOTES? 371-2099 includes : Cable Kit System Board J5 to I/O Board J1 Cable Power Supply P3 to Disk Backplane 0 and 1 Cable DVD Data/Power Cable REFERENCE INFORMATION See http://download.oracle.com/docs/cd/E19121-01/sf.x2200m2/819-6597-12/Chap4.html#0_78758 for cable routing diagram. Attachments This solution has no attachment |
||||||||||||
|