![]() | Sun System Handbook - ISO 4.1 October 2012 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||
Solution Type Technical Instruction Sure Solution 1347665.1 : How to Remove and Replace V240 Power Cord:ATR:745:0
In this Document
Applies to:Sun Fire V240 Server - Version: Not Applicable to Not Applicable - Release: N/A to N/AInformation in this document applies to any platform. GoalHow to Remove and Replace V240 Power CordSolutionDISPATCH INSTRUCTIONSWHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) Nothing beyond basic partner training to be qualified as a Sun Service Delivery Partner. TIME ESTIMATE: 15 minutes TASK COMPLEXITY: 0 FIELD ENGINEER INSTRUCTIONS PROBLEM OVERVIEW: Power Cord failed. WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : A data backup is not a pre-requisite but is a wise precaution. The customer is not required to perform a system shutdown. The Sun Fire V240 server has dual redundant power supplies each with its own power cord. You can swap one power cord while the other one is still running. WHAT ACTION DOES THE ENGINEER NEED TO TAKE: Replace the bad power cord. OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: If the replacement was a hot swap on a redundant configuration, the system should be operational and need no further work. If the replacement required a shut down, the server needs to be turned on and returned to service. PARTS NOTE: Refer to the System Handbook for the country specific type of power cord. https://support.oracle.com/handbook_private/Systems/SunFireV240_R/SunFireV240_R.html REFERENCE INFORMATION: Service Manual http://download.oracle.com/docs/cd/E19088-01/v240.srvr/819-4207-10/819-4207-10.pdf and Administration Guide http://download.oracle.com/docs/cd/E19088-01/v240.srvr/819-4208-10/819-4208-10.pdf Attachments This solution has no attachment |
||||||||||||
|