Asset ID: |
1-71-1332236.1 |
Update Date: | 2012-07-26 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
1332236.1
:
How to remove and replace an x4275 Power Distribution Board (PDB) Ribbon Cable:ATR:1945:0
Related Items |
- Sun Fire X4275 Server
- Exadata Database Machine V2
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: x64-CAP VCAP
|
In this Document
Applies to:
Sun Fire X4275 Server - Version Not Applicable and later
Exadata Database Machine V2 - Version Not Applicable and later
Information in this document applies to any platform.
Goal
Remove and replace an x4275 Power Distribution Board (PDB) Ribbon Cable
Fix
CAP PROBLEM OVERVIEW: Faulty PDB Ribbon Cable
DISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
No specific training required
TIME ESTIMATE: 15 minutes
FIELD ENGINEER INSTRUCTIONS
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
A data backup is not a pre-requisite but is a wise precaution.
The customer should conduct an orderly software system shutdown.
Then power down the system and disconnect the Power Cord.
WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
Remove cover
Replace PDB Ribbon Cable
Refit cover and power on
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Check for full system functionality
PARTS NOTE:
None
REFERENCE INFORMATION:
Sun Fire X4170, X4270, and X4275 Servers Service Manual
http://download.oracle.com/docs/cd/E19871-01/820-5830-13/index.html
Attachments
This solution has no attachment