Sun Microsystems, Inc.  Sun System Handbook - ISO 4.1 October 2012 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1316214.1
Update Date:2012-07-26
Keywords:

Solution Type  Technical Instruction Sure

Solution  1316214.1 :   How to remove and replace a System Board Battery in an X4270 M2:ATR:2126:0  


Related Items
  • Exadata Database Machine X2-8
  •  
  • SPARC SuperCluster T4-4
  •  
  • Exadata Database Machine X2-2 Qtr Rack
  •  
  • Exadata Database Machine X2-2 Half Rack
  •  
  • Exadata Database Machine X2-2 Full Rack
  •  
  • SPARC SuperCluster T4-4 Half Rack
  •  
  • Exadata Database Machine X2-2 Hardware
  •  
  • Sun Fire X4270 M2 Server
  •  
  • Big Data Appliance Hardware
  •  
  • SPARC SuperCluster T4-4 Full Rack
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: x64-CAP VCAP
  •  




In this Document
Goal
Fix


Applies to:

Sun Fire X4270 M2 Server - Version Not Applicable and later
Big Data Appliance Hardware - Version Not Applicable and later
Exadata Database Machine X2-2 Qtr Rack - Version Not Applicable and later
Exadata Database Machine X2-2 Half Rack - Version Not Applicable and later
Exadata Database Machine X2-2 Full Rack - Version Not Applicable and later
Information in this document applies to any platform.

Goal

How to rmove and replace a System Board Battery in an X4270 M2

Fix

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
X4270 M2 Server Training

TIME ESTIMATE: 30 minutes

FIELD ENGINEER INSTRUCTIONS

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

1. Prepare the server for service.
   a. Power off the server and disconnect the power cord (or cords) from the power supply (or supplies).
   b. Remove the server from the rack.
   c. Attach an antistatic wrist strap.
   d. Remove the top cover.

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
Removing the Battery.
2. Remove the battery.
   a. Place you finger between the battery and side wall of the server chassis and push the battery away from the side wall.
   b. Twist the battery (either clockwise or counter-clockwise) and lift it out.
Installing the Battery.
1. Unpack the replacement battery and place it on an antistatic mat.
2. Press the new battery into the battery holder with the positive side (+) facing the server chassis side wall.
3. If the service processor is configured to synchronize with a network time server using the Network Time Protocol (NTP), the ILOM clock will be reset as soon as the server is powered on and connected to the network. Otherwise, proceed to the next step.
4. If the service processor is not configured to use NTP, you must reset the ILOM clock using the ILOM CLI or the web interface.
5. Return the server to operation.
   a. Install the top cover.
   b. Return the server to the normal rack position.
   c. Reconnect the power cord(s) to the power supply (or supplies) and power on the server. Verify that the AC Present LED is lit.

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:

PARTS NOTE:

REFERENCE INFORMATION:

Sun Fire X4270 M2 Server Service Manual
http://download.oracle.com/docs/cd/E19245-01/E21671-02/index.html