![]() | Sun System Handbook - ISO 4.1 October 2012 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||
Solution Type Technical Instruction Sure Solution 1315708.1 : How to Remove and Replace a SE6X20 and T3 Power Cord Kit:ATR:1725:0
In this Document
Applies to:Sun Storage 6320 System - Version: Not Applicable and later [Release: N/A and later ]Sun Storage 6020 Array - Version: Not Applicable to Not Applicable [Release: N/A to N/A] Sun Storage 6120 Array - Version: Not Applicable and later [Release: N/A and later] Sun Storage T3 Array - Version: Not Applicable and later [Release: N/A and later] Information in this document applies to any platform. GoalSE6X20 and T3 Power Cord KitSolutionDISPATCH INSTRUCTIONSWHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) Product training or field hardware experience. DELIVERY REQUIREMENT: Site specific maintenance guidelines for hot swappable components. FIELD ENGINEER INSTRUCTIONS PROBLEM OVERVIEW: Replace power cord WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE ACTIVITY? : A data backup is not a pre-requisite but is a wise precaution. The customer is not required to perform a system shutdown. WHAT ACTION DOES THE ENGINEER NEED TO TAKE: Follow standard ESD precautions. Replace bad or suspected bad power cords one at a time verifying functionality before proceeding. OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: Verify all components are energized. PARTS NOTE: REFERENCE INFORMATION: SE 6x20 Reference and Service Manuals http://download.oracle.com/docs/cd/E19957-01/ T3 and T3+ Array Installation, Operation and Service Manual: http://download.oracle.com/docs/cd/E19699-01/ TIME ESTIMATE: 30 minutes Attachments This solution has no attachment |
||||||||||||
|