Sun Microsystems, Inc.  Sun System Handbook - ISO 4.1 October 2012 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1271921.1
Update Date:2012-02-10
Keywords:

Solution Type  Technical Instruction Sure

Solution  1271921.1 :   How to Replace an AC Power Cord for Sun Fire V1280/E2900 and Netra 1280/1290:ATR:894:0 [Video]  


Related Items
  • Sun Fire E2900 Server
  •  
  • Sun Netra 1290 Server
  •  
  • Sun Fire V1280 Server
  •  
  • Sun Netra 1280 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
  Goal
  Solution


Applies to:

Sun Fire V1280 Server - Version: Not Applicable and later   [Release: N/A and later ]
Sun Fire E2900 Server - Version: Not Applicable to Not Applicable   [Release: N/A to N/A]
Sun Netra 1280 Server - Version: Not Applicable and later    [Release: N/A and later]
Sun Netra 1290 Server - Version: Not Applicable and later    [Release: N/A and later]
Information in this document applies to any platform.

Goal

Video - Sun Fire V1280/E2900 Netra 1280/1290 Action Plan: Power Supply Replacement (2:05)

Solution

PROBLEM OVERVIEW:
Power cord failed

TIME ESTIMATE: 30 minutes

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?:

The E2900 has redundant power feeds, therefore, no shutdown is required for a single power cord failure.

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE:
Replace the bad power cord.

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:

If the replacement was a hot swap on a redundant configuration, the system should be operational and need no further work.

Restart software applications per applicable administration guides to resume system operation.

REFERENCE INFORMATION:

Attachments
This solution has no attachment
  Copyright © 2012 Sun Microsystems, Inc.  All rights reserved.
 Feedback