Sun System Handbook - ISO 3.4 June 2011 Internal/Partner Edition | |||
|
|
Solution Type Technical Instruction Sure Solution 1310451.1 : How to Replace x4600 CPU Filler Board:ATR:1218:0
In this Document
Applies to:Sun Fire X4600 Server - Version: Not ApplicableInformation in this document applies to any platform. GoalReplace x4600 CPU Filler BoardSolutionDISPATCH INSTRUCTIONSWHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) No specific skills required DELIVERY REQUIREMENT: Schedule maintenance window FIELD ENGINEER INSTRUCTIONS PROBLEM OVERVIEW: Requirement to insert filler panel due to defective filler panel or for troubleshooting purposes WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : Data backup not required but recommended as a precaution Orderly shutdown of applications Shutdown of OS and power down of server WHAT ACTION DOES THE ENGINEER NEED TO TAKE: Ensure standard ESD procedures are followed 1. Power off the server and unplug (REMOVE) the power cords 2. Remove the main cover 3. Locate the CPU filler board that needs to be replaced 4. Remove the CPU filler board by simultaneously rotating the plastic levers on both sides to 90 degree position and gently lift the board straight up 5. Ensure the plastic levers of the replacement CPU filler board are in the open (vertical) position. Align the module with the guides and gently Insert the replacement CPU filler board into the same bay/slot. Close the levers downwards so they are in flat (horizontal) position 6. Replace the main cover 7. Re-attach power cords OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: Power on and bring up system. Verify no issues (all CPUs are visible to OS) PARTS NOTE: REFERENCE INFORMATION: Sun Fire x4600 and Sun Fire x4600 M2 Servers Service Manual http://download.oracle.com/docs/cd/E19121-01/ TIME ESTIMATE: 30 minutes (approx) Attachments This solution has no attachment |
||||||||||||
|