Sun StorEdge 3120 Array
: Archived FINs and FCOs
Implementation (Impl.):
M = Mandatory (Fully Pro-Active)
C = Controlled Pro-Active (per Sun Geo Plan)
U = Upon Failure
R = Reactive (As Required) |
FAB
|
Implementation
|
Synopsis
|
Last Modified Date
|
A0247-1 |
U
|
Sun StorEdge 3120 AC power supply unit may fail as a result of electrical arc-over, causing a failover to the second power supply. |
Feb 01 2005
|
|