Sun Microsystems, Inc.   Sun System Handbook - ISO 3.4 June 2011 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Sun StorEdge[tm] 3120 Array, RoHS:YL : Archived FINs and FCOs

Implementation (Impl.):
M = Mandatory (Fully Pro-Active)

C = Controlled Pro-Active (per Sun Geo Plan)

U = Upon Failure
R = Reactive (As Required)

FAB Implementation Synopsis Last Modified Date
A0247-1 U Sun StorEdge 3120 AC power supply unit may fail as a result of electrical arc-over, causing a failover to the second power supply. Feb 01 2005
  Copyright © 2011 Sun Microsystems, Inc.  All rights reserved.
 Feedback