Sun Enterprise[tm] 250 Server: Repair Procedures
This section provides the most common repair procedures for the 
  Enterprise 250. The written procedures below are links to the  Sun 
  Enterprise 250 Server Owner's Guide (805-3389).  
Clustered Hardware Note: When repairing a clustered system, 
  you should replace server components by first switching over the data services 
  to the functioning server, halting the host to be serviced, powering down the 
  host, and then performing the hardware procedure to replace the component. Following 
  the procedure, the logical hosts should be switched back to the default masters. 
   
    | Component | 
     
       Remove 
     | 
     
       Install 
     | 
    Tips | 
   
   
    | CD-ROM/DVD-ROM Drives | 
     
      
     | 
     
      
     | 
      | 
   
   
    | CPU Module | 
     
      
     | 
     
      
     | 
     
      
        - Sun Enterprise 250 Server 400MHZ CPU Modules may sustain damage during 
          installation (FIN I0485-1).
 
        - The current diagnostic procedure to identify the faulty 
          CPU module from CPU Ecache parity errors is flawed (FIN I0570-3).
 
        - Tuning the ecache_scan_rate parameter of the Solaris cache scrubber 
          provides improved Ecache parity error protection on non-mirrored SRAM 
          UltraSPARC II-based systems (FIN I0755-1).
 
           
       
     | 
   
   
    | Disk Cage Assembly | 
     
      
     | 
     
      
     | 
      | 
   
   
    |  
       Disk Drive 
     | 
     
      
     | 
     
      
     | 
     
      
        - 18.2GB and 36GB IBM disk drives may be susceptible to early life failures 
          problem (FIN I0724-2). 
        
 
        - 18GB and 36GB IBM disk drives experiencing high failure rate in high 
          humidity and high temperature environments (FCO A0182-1). 
        
 
       
     | 
   
   
    | Fan Tray Assembly | 
     
      
     | 
     
      
     | 
      | 
   
   
    | Floppy Drive | 
     
      
     | 
     
      
     | 
     
        
         
     | 
   
   
    | Memory  | 
     
      
     | 
     
      
     | 
     
        
         
     | 
   
   
    | NVRAM/TOD Module | 
     
      
     | 
     
      
     | 
     
      
        - Failure to remove power cables from E250 system board may result in 
          NVRAM corruption (FIN I0427-1).
 
       
     | 
   
   
    | PCI Card | 
     
      
     | 
     
      
     | 
     
      
        -  
          
 
             
              SunPCi II and SunPCi IIpro cards may not respond 
                after rapid/successive power cycling (FCO  A0186-1).  
             
           
         
        -  
          
src/p card causes e450 to fail boot with upa-port 
            error (SRDB  23897). 
            
         
        - Systems based on the PSYCHO chipset panic with a PCI bus error (SRDB 
          40602). 
        
 
       
     | 
   
   
    | Power Distribution Board | 
     
      
     | 
     
      
     | 
      | 
   
   
    | Power Supply | 
     
      
     | 
     
      
     | 
       | 
   
   
    | Removable Media Assembly (RMA)  | 
     
      
     | 
     
      
     | 
     
        
         
     | 
   
   
    | SSP Paddle Card | 
     
      
     | 
     
      
     | 
      | 
   
   
    | System Board | 
     
      
     | 
     
      
     | 
     
      
        -  
          
Setting NVRAM, RSC-MAC Addr and RSC Params after replacing 
            E250 System Board (InfoDoc  21614).  
         
       
     | 
   
   
    | Tape Drive | 
     
      
     | 
     
      
     | 
      | 
   
   
    | UltraSCSI Backplane | 
     
      
     | 
     
      
     | 
      | 
   
 
 
 |